Durham County Council's story
Widespread on-street charging is essential to enable households without driveways or garages the chance to switch to electric vehicles.
In County Durham 43% of residents live in rural areas and 40% of housing is terraced with no off-street parking. That's why the County Council has placed accessible public chargepoints at the centre of its plans to promote electric vehicles. The council's Chargepoint Delivery Plan 2021 has five key actions:
- Lead by example by providing chargepoints on council sites and transferring the council's vehicle fleet to electric.
- Develop a network of public chargepoints.
- Provide charging infrastructure for the council's fleet.
- Support appropriate private sector proposals for charging infrastructure.
- Pursue partnerships, funding and education for other electric vehicle opportunities.
The authority's long-term goal is for every Durham resident to live within a five-minute walk of an electric vehicle chargepoint. Its short-term goal is to have at least one chargepoint in each of the county's 77 wards. To do this, the council is taking part in three schemes.
- The Durham Other Chargepoints project, which is backed by the UK Government's On-Street Residential Charge Point Scheme.
- The Weardale Electric Vehicle Accelerator project, also backed by the On-Street Residential Charge Point Scheme.
- The Scaling On Street Charging Infrastructure (SOSCI) project, sponsored by Innovate UK.
All of these schemes aim to increase on-street charging provision, especially in places overlooked by the private sector. Companies tend to focus on installing chargers in dense urban areas that already have higher electric vehicle usage, rather than to encourage uptake in rural areas or villages and small towns.
Useful learnings from Durham County Council
Inequality in electric vehicle ownership:
Increasing accessible charging infrastructure will make the switch to electric vehicles more viable but will not on its own lead to their widespread adoption. Currently, most electric vehicle owners are relatively wealthy. Charging will not benefit individuals who cannot afford an electric vehicle in the first place.
Even once lower income households begin to take up electric vehicles, they could face charging inequalities. Using on-street public chargepoints is currently more expensive than private home charging (which comes through homeowners' domestic tariff) but is the only option for some residents. As electric vehicles become more widespread the UK government should work with local authorities to lower on street charging costs.
With many low-income households not owning a car, improvements to public transport will remain a key solution to help address transport inequalities as well as cut emissions.
National policy:
From 2030 sales of new petrol and diesel cars will be banned in the UK. To be prepared, local authorities need to begin planning for wider provision of electric vehicle infrastructure.
Charger type:
Councils must choose between rapid chargers, which take 30-45 minutes per charge, or fast chargers, which take three or four hours. There is a significant cost differential; three fast chargers can be installed for the price of one rapid charger. However, residents may prefer the convenience of a rapid charger over the greater availability of fast chargers. Which type of charger is most suitable will vary from site-to-site.
Site selection:
Choosing the right sites can be tricky when weighing cost considerations against prime accessible locations. Site ownership can also prove problematic so ideally chargepoints should be installed on local authority land to minimise barriers, where possible.
Durham County Council's metrics
More charging points:
By December 2021, about 100 new charging points had been installed. This will increase to between 160 and 170 chargepoints by early 2022.
County Durham is part of the wider SOSCI project which will install 200 chargers over 18 months across Northern England, to bring numbers closer to those found in London and South East England.
Example – Stanhope village:
Stanhope in Weardale was selected as the site for the Weardale Electric Vehicle Accelerator project, where a row of 10 chargepoints were installed in the village. The Stanhope charging bank helped support an already existing and highly popular car club. Residents pay £6 a month and can book an electric car out for a few hours, giving them car access without the cost of maintenance or insurance.
Making chargepoints accessible:
The council is also making sure local chargepoints are designed to be accessible to people with disabilities, hiring a consultant to oversee this work. This is particularly important as many disabled people are dependent on private vehicles as their main form of transport. In October 2021 the council invited residents to an open event on the issue, where they could try using a chargepoint. Their feedback will be used to inform future chargepoint design.